BART Stations Water Intrusion Repairs

The Water Intrusion Repairs project includes 8 stations along BART's A-Line and 7 stations along the C&R Lines. As part of a joint venture prime role, FMG worked with BART Maintenance and Engineering to develop recommendations and present findings in  an Engineering Assessment Report. The goal of these projects is to develop contract documents for needed repairs which will mitigate water leakage from the platform level at the stations and where applicable, attenuate the water entering the concourse level of the station where it interferes with BART operations and impacts patrons and BART employees. This assessment also addresses current signs of water leakage on bent caps, columns, and wall surfaces evident from the concourse level to facilitate identification of future leakage.

A Line Stations:
• Fremont
• Union City
• South Hayward
• Hayward
• Bay Fair
• San Leandro
• Coliseum
• Fruitvale

C&R Line Stations
• Orinda
• Lafayette
• Walnut Creek
• Concord
• El Cerrito Plaza
• El Cerrito Del Norte
• Richmond

Comments are closed.